Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Mazda to make 1,000 more copies of final RX-8

Fri, 27 Apr 2012

Wankel wankers, rejoice: The Mazda rotary engine has received a short stay of execution. Mazda is building 1,000 more RX-8 Spirit R models, and then the car is gone forever. Well, maybe not forever.

70-year-old Bugatti Type 64 chassis gets a body, the old-fashioned way

Mon, 16 Jan 2012

In a workshop north of Detroit, craftsmen have been at work for months pounding pieces of aluminum into panels. The panels will eventually cover a Bugatti chassis that has been bodyless for more than seven decades. Three Bugatti Type 64 Coupe chassis were built in 1939 by Jean Bugatti, and two of them got bodies before Bugatti was killed while testing the Le Mans-winning Type 57 C “Tank” in August 1939.

Green Light For More Smart Motorway Schemes

Wed, 09 Jul 2014

THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.